Marimaca Reports Positive Metallurgical Results From Variability Testing Program

VANCOUVER, British Columbia, Nov. 30, 2021 (GLOBE NEWSWIRE) — Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce results of the variability test work metallurgical program (the “Variability Program” or the “Program”) for the Company’s flagship Marimaca Copper Project (“Marimaca” or “the Project”), located in northern Chile. The variability test work was completed as a component of the Company’s ongoing Phase 5 Metallurgical program and additional associated studies, which are expected to be completed in early Q1 2022. The ongoing 2021 metallurgical campaign is focused on finalizing the metallurgical characterization of the Project to a bankable level and builds on the results from the Phase 4 Metallurgical program (see September 9 2020 announcement). Read More